Been a hectic last few weeks, so I'll keep it short and post the pics for everyone to see what we've been up to...
 |
After the wall has come down and the tasting room is getting ready for a new bathroom. |
 |
| Looking into the front of the tasting room area |
 |
Back side of the brewery where the walk-in cooler will be
|
 |
| Back side of the brewery/tasting room |
 |
This is going to be the brewing area
|
 |
| These two are views from the back of the brewery looking towards the street. |
This is a view from 9th st looking towards the brewery
 |
| The 7bbl boil kettle is coming along nicely... |
0 comments:
Post a Comment